Get Support

123-456-789-10

TR | EN | RU | ES | AR

Pu-Coat II SKM / Pu-Coat II SKP - Matte and Gloss Aliphatic Polyurethane Top Coat Paint

Description
Aliphatic, UV-resistant, double component, polyurethane based, matte and glossy top coat paints which can be applied onto epoxy coatings, concrete and metal indoor and outdoor surfaces.
Usage Areas
• As a top coat floor or wall paint; on concrete and metal surfaces,
• On surfaces with Pu and epoxy coating,
• In industrial steel buildings,
• In production and storage areas, garages, hangars and loading ramps,
• In parking areas,
• In outdoor sporting fields,
• In tennis courts,
• In data processing and control centers.
Advantages
• It is resistant to water, sea water, salt, numerous chemicals, outdoor weather conditions, weak acids and bases.
• It is resistant to scratch and abrasion.
• It has high ultraviolet stability. It does not lead to chalking and colour change.
• It is suitable to sterile conditions. It is hygienic and easy to clean.
• The surface treated becomes waterproof.
Surface Preparation
• Pressure strength of the concrete to be treated must be 25 N/mm2 minimum and tensile strength 1,5 N/mm2 minimum.
• The humidity ratio in the concrete must be lower than 5%. Matte and Bright Aliphatic Polyurethane Top Coat Paint 91
• The surface to be treated must be clean and dry and free from any other substance such as dirt, grease, old coatings and curing materials.
• Gaps and holes must be completely cleared first and then filled to smooth the surface.
• Any swelling must be sandpapered and levelled.
• All dust and loose and displaced particles must be removed by using a brush and/or vacuum cleaner.
• During application relative humidity must not exceed 50% when the ambient temperature is +10°C, and 80% when the ambient temperature is +30°C.
• The temperature of the surface to be treated must be between +10°C and +30°C.
• The temperature of the surface to be treated must be 3°C higher than the dew point.
• Ambient temperature and surface temperature must be increased by using heaters for the applications performed in cold weather conditions and Pu-Coat II SKM/SKP containers must be kept under +20°C the previous night.
• Direct Pu-Coat II SKM/SKP applications on concrete does not require undercoating.
• If former Pu-Coat II SKM/SKP coating has been applied more than 12 hours ago, the surface must be sandpapered thoroughly before the application of Pu-Coat II SKM/SKP.
Application
First stir Component A and Component B separately, and then addComponent B to Component A and stir the mixture continuously to a homogenous consistency with a low speed mixer for 3 minutes. To minimize air drag avoid stirring too much. The mixture should be applied to the prepared surface with a merino roller. The first coat can be thinned with 10% cellulosic thinner. The thickness of each coat must not exceed 100 microns. 2 coats will be sufficient. It is critical to apply
the second coat on time. Otherwise decreased adherence may lead to cleavage. If the edges match ‘wet’ during application, a seamless effect can be created.
Consumption
Approximately 0,300 kg/m2 in two coats.

 

Packaging

Pu-Coat II SKM (Matte)

7 kg Component A + 0,5 kg Component B = Net 7,5 kg as a set

Pu-Coat II SKP (Gloss)

6,5 kg Component A + 1 kg Component B = Net 7,5 kg as a set

       PU-COAT II SKM

SPECIFICATION

RESULT

APPEARANCE

Coloured, Liquid (Comp. A)

Transparent, Liquid (Comp. B)

DENSITY (Comp. A + Comp. B)

1,9 (±0,05) gr/cm3 (Comp. A)

1,0 (±0,05) gr/cm3 (Comp. B)

POT LIFE

50 min. (20oC)

10 min. (300C)

CURING TIME

Pedestrian Traffic: 24 hours 

Light Traffic : 3 days

Full Drying: 7 days

SOLID CONTENT

80%

BOND STRENGTH TO CONCRETE

>3N/mm2

APPLICATION TIME BETWEEN TWO COATS

12 hours (at 200C)

HEAT RESISTANCE

+500C (Continuously)                               +800C (Max. 7 days)                         +1000C (Max. 12 hours)

 

      PU COAT II SKP

SPECIFICATION

RESULT

APPEARANCE

Coloured, Liquid (Comp. A)

Transparent, Liquid (Comp. B)

DENSITY (Comp. A + Comp. B)

1,9 (±0,05) gr/cm3 (Comp. A)

1,0 (±0,05) gr/cm3 (Comp. B)

1,7 (±0,05) gr/cm3 (Mixture)

POT LIFE

50 min. (20oC)

10 min. (300C)

CURING TIME

Pedestrian Traffic: 24 hours 

Light Traffic : 3 days

Full Drying: 7 days

SOLID CONTENT

80%

BOND STRENGTH TO CONCRETE

>3N/mm2

APPLICATION TIME BETWEEN TWO COATS

12 hours (at 200C)

HEAT RESISTANCE

+500C (Continuously)                            +800C (Max. 7 days)                           +1000C (Max. 12 hours)

Türk Malı
Türk Ak
İzoder
Suder
Szutest