Get Support

123-456-789-10

TR | EN | RU | ES | AR

Epoxy Coal Tar 100/10 Epoxy - Coal Tar Based Coating with Solven

Description
Epoxy Coal Tar 100/10 is a two component, tar-epoxy based, low viscosity paint and waterproofing material with solvent.
Usage Areas
Epoxy Coal Tar 100/10 has been specifically developed for coating and waterproofing on concrete, metal, wood and likely materials.
Advantages
• It fills the pores on concrete and metal surfaces.
• It is easy to use material. After it is cured, it becomes hard and firm paint.
• Excellent resistance against mechanical influences, oil and chemicals.
• Excellent adhesion to common surfaces like steel, concrete, stone, artificial stone, wood, etc. Adhesion does not deteriorate if product submersed in water, sea water, sewage and oils.
Application
Mixing : Mix the content of Part A thoroughly for 1 minute before adding Part B. Mix together until
a smooth even consistency is achieved. It is important that the entire quantity of part B is
added to part A.
Mixing Time : Mix thoroughly for a minimum of 3 minutes.
Mixing Tools : Use a low speed electric stirrer (300-500 rpm).
Application Method /Tools: Immediately after mixing, the coating material is applied on the prepared surface by roll, brush or spray. Applied surface must be protected from water for 4-5 hours.
Consumption
At each layer 0,300 - 0,450 kg/m2
Packaging
10 kg Bitum + 1 kg Hardener = 11 kg Set

Base                                                                     :A+B (epoxy + hardener)
Colour                                                                 :Black                   
Mixing rate                                                       :10/1
Solid                                                                     :% 94,5
Density                                                            :1,35 gr/cm³ (20°C)
Pot life of the mixture                                  :60 minutes (20°C, %50 RH)
Cure Time For Light Trafficability              :4 hours (20°C)/ 6-8 hours (10-200C)
Cure Time For Heavy Trafficability           :24 hours (20°C)
Cure Time For Chemical Resistance        :7 days (20°C)
Application Temperature                            :10-35°C (Surface)
                                                                               15-25°C (Product)
                                                                               15-35°C (Medium)
Türk Malı
Türk Ak
İzoder
Suder
Szutest